Assign one person to coordinate the building, crew and staff. Build a list of desks, chairs, files and electronics. Decide what moves first and what stays in service until the last day.
Before moving day
Label equipment by workstation. Have your IT contact plan backups and shut down devices. Keep confidential records in controlled boxes with a named staff member responsible for handoff.
On moving day
Tape a numbered floor plan by the destination door. Match each label to a desk or room and set a separate staging area for items that need reassembly.
If you have transportation arranged and need help with lifting, loading, or unloading, book NYC Pro Tasker moving labor.

